 |
















| |
Nolan Ryan nurtures
a close working relationship with clients and design professionals
during the entire life of a project. |
|
|
|
 |
Civil Engineering
|
 |
 |
 |
| Urban Renewal Waterford |
Client: Waterford City Council |
|
Description: |
| Pedestrianisation of Barron Strand street and Arundal square incorporating granite paving, street furniture and artistic water feature including drainage and services installations. |
|
 |
 |
 |
 |
| Carrigtwohill Industrial estate |
Client: I.D.A Ireland. |
|
Description: |
| Road alterations with ancillary pumping station and storm water attenuation pond. |
|
 |
 |
 |
 |
| Midleton bridge |
Client: Kasgrove Ltd. |
|
Description: |
| Two lane 21 metre span bridge of precast concrete construction. Ancillary works included a new access road with alterations to the existing road, drainage and services, weirs and deflection islands. So as not to impinge on the upstream journey of the salmon, enabling works included the temporary diversion of the Owenacurra river |
|
 |
 |
 |
 |
| LUAS Suir road bridge |
Client: C.I.E. |
|
Description: |
| 40 metre dual tram line bridge over the Grand canal at the junction with Suir Road - a part of the Dublin LUAS tramline system |
|
 |
 |
 |
 |
| Monaghan waste water treatment plant |
Client: Bowen Water |
|
Description: |
| Design and build waste water treatment scheme. |
|
 |
 |
 |
 |
| Limerick Main Drainage |
Client: Limerick Corporation |
|
Description: |
| Sludge treatment for Limerick main drainage scheme. |
|
 |
 |
 |
 |
| Acron Mines Closure |
Client: Acron Mines. |
|
Description: |
| NRP appointed as cost consultants to evaluate the overall cost of closing down Galmoy Mine with subsequent rehabilitation. |
|
 |
 |
|
|
|
 |